The main challenge was integrating the engineering systems into the architectural concept of the TTMG bureau while preserving the high consumer qualities of the facades and layouts.
The lack of a technical underground forced us to place all engineering networks — ventilation, air conditioning, power supply, and low‑voltage systems — in a narrow corridor on the roof. This solution freed up the interior space and preserved the aesthetics of the facades, but it required non‑standard technical approaches.